Advanced Planning and Scheduling Software (APS)
Your production, perfectly planned. Accevo APS is advanced planning and scheduling software that works alongside your ERP to build realistic, optimized production schedules – at the push of a button, respecting every real constraint.
Built on GANTTPLAN by DUALIS, our Dürr Group partner: finite capacity scheduling, integrated MRP, interactive Gantt chart and what-if scenarios, in a modern web application.
Trusted by manufacturing leaders
What is APS (advanced planning and scheduling)?
An APS system is production planning software that schedules manufacturing orders against the resources you actually have: machine capacity, personnel and their qualifications, tools and materials. Unlike ERP or MRP planning, which assumes infinite capacity, APS software applies finite capacity scheduling – so the plan it produces can actually be executed on the shop floor.
APS vs ERP planning: what is the difference?
ERP planning
(SAP, Oracle, Microsoft, Infor, Comarch) is built for commercial and material processes. Its scheduling assumes infinite capacity: it tells you what to make and roughly when, without checking whether the machines, people and tools are free.
ERP production planning gives you:
- Manual entries, manual calculations, and errors discovered at batch release
- Days of QA review per batch, checking every line of every form
- Archiving rooms full of binders, and slow retrieval during audits
- Traceability reconstructed by hand when a deviation or recall hits
APS software
takes those rough orders and turns them into a detailed, feasible sequence using finite capacity scheduling and multi-criteria optimization. APS does not replace ERP – it is the planning layer between ERP and MES that makes the plan real.
An APS system adds:
- Finite capacity scheduling across machines, personnel, tools and material at once
- Multi-criteria optimization: setup costs, throughput time, utilisation, delivery reliability
- Interactive Gantt chart with restriction-checked drag-and-drop changes
- What-if scenario analysis before you commit to a plan
30%
efficiency increase
25%
cost savings
50%
time saved in planning
100%
transparency across the plan
Key features of Accevo APS software
Everything a planner needs in one web-based advanced planning scheduling system – no client install, accessible from anywhere, with the planner always in control of the automated result.

Automated planning & optimisation engine
Generate a feasible, optimized schedule at the push of a button. The engine balances up to seven weighted target criteria – setup costs, production costs, personnel costs, throughput times, capacity utilisation, capital commitment and delivery reliability.

Multi-resource planning
Machines and work centres, personnel with qualifications, production resources and tools, and material – all planned simultaneously, so a plan is never blocked by the one resource nobody checked.

Integrated material planning with ATP/CTP
Material availability is planned alongside machines, personnel, tools and capacities. ATP and CTP checks enable reliable delivery-date commitments based on real production constraints, helping planners identify shortages early and create realistic, executable schedules.

Bottleneck-oriented scheduling
Multi-level BOMs are scheduled around the constraint to synchronise multi-stage manufacturing processes across upstream and downstream production stages. This coordinates the order network, minimises total throughput time and keeps work-in-progress down. Bottleneck analysis becomes routine, not detective work.

Shop-floor feedback from MES
Confirmations, machine states and order progress flow back from Accevo MES in real time, so the plan reflects what is actually happening – not what was assumed this morning.

Planning analytics & predictive insights
Historical planning and shop-floor data are analysed to reveal patterns, deviations and optimisation potential. Predictive models support more realistic process durations, improved delivery-date forecasts and better-informed planning decisions.
Finite Capacity Scheduling & Interactive Gantt Chart
Create transparency across your entire production network and make reliable delivery commitments based on realistic capacity availability. The intuitive planner cockpit combines visual production planning and a graphical planning board, enabling planners to react immediately to disturbances and re-plan within minutes.
Finite capacity scheduling
Every operation is scheduled within the real limits of the resource: machine availability, shift calendars, tooling, qualifications and material. No overbooking, no plans that only work on paper.
Interactive Gantt chart
Drag and drop orders directly on the Gantt chart. Every manual intervention is restriction-checked in real time, so a planner’s local fix can never break a global constraint.
Utilisation & bottleneck views
Switch between order view, resource utilisation and cost allocation. Bottlenecks, idle capacity and late orders are visible at a glance, with drill-down to any work centre or timeframe.
What-if scenario analysis: test the plan before you live it
A rush order lands. A machine goes down. A key operator calls in sick. With scenario mode you simulate the change in seconds, compare plans side by side against your KPIs, and pick the one that costs least – before anything reaches the shop floor. The same capability supports tactical and strategic decisions: capacity investments, shift models, new product introductions. Planning stops being a reaction and becomes a decision.
ERP integration: SAP, Microsoft, Oracle, Infor & more
APS sits between your enterprise systems and the shop floor. Accevo APS integrates with all major ERP systems via REST APIs and dedicated connectors, aligned with the ISA-95 standard for enterprise-to-control integration.
From ERP
Master and transaction data, personnel, work centres, production resources and tools, BOMs, routings and demands flow in from SAP, Microsoft Dynamics, Oracle, Infor or Comarch – synchronised bidirectionally.
In APS
Planning and optimisation, order sequencing, constraint handling, Gantt chart visualisation and analysis. The optimized schedule is written back to ERP as the committed plan.
From MES
Confirmations, machine states and real-time order progress come back from the shop floor, closing the loop so the next planning run starts from reality rather than assumption.
Benefits: shorter lead times, lower costs
Manufacturers using our APS report the same pattern: planning that used to take two days takes two hours, and the plan that results is cheaper to execute. Where the gains come from:

Shorter lead times
Bottleneck-oriented sequencing and smooth order flow cut throughput times across the order network, while work-in-progress and capital commitment fall with them.

Higher on-time delivery
Realistic, finite-capacity plans plus ATP/CTP checks mean the delivery dates you promise are dates you can keep – and customers notice first.

Lower setup and personnel costs
Optimised sequencing groups similar setups and balances workloads, cutting changeover time and idle labour without anyone rebuilding the plan by hand.

Planners freed from firefighting
Automation handles the combinatorics; planners handle the exceptions and the judgement calls. New team members can produce a good plan from their first week.
Industries we plan for
APS manufacturing scheduling applies wherever orders, resources and constraints outgrow a spreadsheet. Over 150 international companies plan with the GANTTPLAN engine behind Accevo APS, across more than 1,000 projects.
Food, beverage & FMCG
Planning for freshness, allergen sequencing and ingredient availability, with fast-changing demand and short shelf life driving waste down.
Discrete Manufacturing
High product variety, long setup times and volatile order volumes - the classic case for optimisation-based sequencing and tool-set management.
Pharma & life sciences
Batch tracking, expiry-based planning and compliance constraints built into the schedule, integrated with EBR and quality systems.
Automotive & electronics
Just-in-time scheduling against complex, changing supply chains, with fast product changes handled by agile re-planning rather than manual rework.
Contact with our Expert
Marcin Marczewski, Industrial Software Expert
- A 60-minute online meeting with a dedicated specialist presenting a top system from an industry similar to yours
- Live modeling of your production process
- A budget quotation after the meeting